Alpharetta 54" Water Transmission Main

Owner: City of Alpharetta DWR

Engineer:

 

Norris Lake Pump Station & Force Main

Owner: Gwinnett County DWR

 

 

Lower Big Haynes Sanitary Sewer
Owner: Gwinnett County DWR

Engineer: Hayes, James & Assoc., Inc.

South Anderson Raw Water Supply
Owner: Anderson Regional Joint Water System

Engineer: Camp Dresser McKee

Upper Walnut Creek Sanitary Sewer Interceptor Ph II

Owner: Henry County WSA        

Engineer: Arcadis G & M, Inc

 

 

 

 

 

 

 

 

Airfield Recycled Materials

Owner:  City of Atlanta, Dept of Procurement
Engineer:  City of Atlanta, Dept of Aviation

 

 

 

 

 

 

 

 

 

 

 

 

Reuse Pipeline & Diffuser to Lake Lanier Contract 2/Sycamore Rd Improvemnets

Owner: Gwinnett County
Engineer: Parsons Water & Infrastructure, Inc.

 

Level Creek Force Main, Contract 2 Project
Owner: Gwinnett County Department of Public Utilities
Engineer:  Arcadis

Augusta Main Interceptor Upgrade Phase 2
Owner: City of Augusta, Georgia

Engineer: Stevenson & Palmer Engineering, Inc.

Hickory Log Creek Dam Ph 2 and Hickory Log Reservoir Raw Water Projects
Owner: Cobb Co-Marrietta Water Authority

Engineer: Brown and Caldwell

Rockdale Water Transmission Main
Owner: Rockdale County Water Resources

Engineer: Brown & Caldwell/Construction Dynamics/JJ&G

Virginia Avenue Substation
Owner: Georgia Power Company

Engineer: Long Engineering, Inc

Atlanta, Georgia 2008
1,979 LF of 24"-84" Class V RCP; 6 Precast Concrete Structures.
Atlanta, Georgia 2008
1,979 LF of 24"-84" Class V RCP; 6 Precast Concrete Structures.
Atlanta, Georgia 2008
1,979 LF of 24"-84" Class V RCP; 6 Precast Concrete Structures.
Atlanta, Georgia 2008
1,979 LF of 24"-84" Class V RCP; 6 Precast Concrete Structures.
Atlanta, Georgia 2008
1,979 LF of 24"-84" Class V RCP; 6 Precast Concrete Structures.
Buford, Georgia 2007
32,000 LF of 36 ” DIP
Buford, Georgia 2007
32,000 LF of 36 ” DIP
Buford, Georgia 2007
32,000 LF of 36 ” DIP
Buford, Georgia 2007
32,000 LF of 36 ” DIP
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Augusta, Georgia 2010
84'' FRPMP 8,000 LF and 72'' FRPMP 4,995 LF
Canton, Georgia 2009
220 LF 72'', 1,230 LF 42'' STEEL and 5,190 LF 42'' DIP
Canton, Georgia 2009
220 LF 72'', 1,230 LF 42'' STEEL and 5,190 LF 42'' DIP
Canton, Georgia 2009
220 LF 72'', 1,230 LF 42'' STEEL and 5,190 LF 42'' DIP
Canton, Georgia 2009
220 LF 72'', 1,230 LF 42'' STEEL and 5,190 LF 42'' DIP
Rockdale County, Georgia 2001
Installed 95,040 LF of 42" thru 30" DIP water transmission main, two river crossings across the Yellow River, and 2540 LF 54" thru 42" tunneling & boring. The project had to be, and was completed within 300 days.
Rockdale County, Georgia 2001
Installed 95,040 LF of 42" thru 30" DIP water transmission main, two river crossings across the Yellow River, and 2540 LF 54" thru 42" tunneling & boring. The project had to be, and was completed within 300 days.
Rockdale County, Georgia 2001
Installed 95,040 LF of 42" thru 30" DIP water transmission main, two river crossings across the Yellow River, and 2540 LF 54" thru 42" tunneling & boring. The project had to be, and was completed within 300 days.
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Atlanta, Georgia 2008
900 LF of 96" RCP & 867 LF of 30" DIP
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Gwinnett County, Georgia 2008
15,000 LF 54'' Sanitary Sewer
Anderson, South Carolina 2011
This was a fast track water supply project that had to supply water to support the expansion of a major manufacture in Anderson. The proposal was sent out as RFP with 60% design drawings. The project consisted of 45,000IF of 36" thru 24" DIP. Contract time was 100 days.
Anderson, South Carolina 2011
This was a fast track water supply project that had to supply water to support the expansion of a major manufacture in Anderson. The proposal was sent out as RFP with 60% design drawings. The project consisted of 45,000IF of 36" thru 24" DIP. Contract time was 100 days.
Anderson, South Carolina 2011
This was a fast track water supply project that had to supply water to support the expansion of a major manufacture in Anderson. The proposal was sent out as RFP with 60% design drawings. The project consisted of 45,000IF of 36" thru 24" DIP. Contract time was 100 days.
McDonough, Georgia 2007
2,300 LF 30'' DIP, 2,900 LF 36'' DIP, 3,400 LF 42'' DIP, 5,370 LF 54'' DIP, and 470 LF of 96'' Tunneling
McDonough, Georgia 2007
2,300 LF 30'' DIP, 2,900 LF 36'' DIP, 3,400 LF 42'' DIP, 5,370 LF 54'' DIP, and 470 LF of 96'' Tunneling
McDonough, Georgia 2007
2,300 LF 30'' DIP, 2,900 LF 36'' DIP, 3,400 LF 42'' DIP, 5,370 LF 54'' DIP, and 470 LF of 96'' Tunneling
McDonough, Georgia 2007
2,300 LF 30'' DIP, 2,900 LF 36'' DIP, 3,400 LF 42'' DIP, 5,370 LF 54'' DIP, and 470 LF of 96'' Tunneling
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
Duluth, Georgia 2010
Removed and hauled off 32,000 cy of silt, new 10x10 box culvert, stone weir structures and stream remediation.
North Fulton County, Georgia 2011
2,700 LF 16" DIP, 19,300 LF 54"DIP, 15,100 LF 42" DIP & 2,400 LF 30" DIP
North Fulton County, Georgia 2011
2,700 LF 16" DIP, 19,300 LF 54"DIP, 15,100 LF 42" DIP & 2,400 LF 30" DIP
Gwinnett County, Georgia 2012
Norris Lake Pump Station & Force Main Design/Build 20,000 LF 16" DIP & Rehabilitate Pump Station
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
North Texoma, Texas 2013
91,454 LF of 96" Class 150 (Installed in open cut trench)
Buford, Georgia 2009
Project included 35,754 LF of 72" Steel reuse pipeline, 16,400 LF of 60" DIP water line, 4,000 LF of 6" - 16" DIP water line and 3,698 LF of 8" DIP gravity sewer line.
Buford, Georgia 2009
Project included 35,754 LF of 72" Steel reuse pipeline, 16,400 LF of 60" DIP water line, 4,000 LF of 6" - 16" DIP water line and 3,698 LF of 8" DIP gravity sewer line.
Buford, Georgia 2009
Project included 35,754 LF of 72" Steel reuse pipeline, 16,400 LF of 60" DIP water line, 4,000 LF of 6" - 16" DIP water line and 3,698 LF of 8" DIP gravity sewer line.
Buford, Georgia 2009
Project included 35,754 LF of 72" Steel reuse pipeline, 16,400 LF of 60" DIP water line, 4,000 LF of 6" - 16" DIP water line and 3,698 LF of 8" DIP gravity sewer line.

Texoma Outfall to Wylie -WTP

Owner: North Texas Municipal Water District

Engineer: Freese and Nichols

 

 

 

 

 

Lake Claibourne

Owner: Gwinnett Co. Dept. of Water Resources

Engineer: Brown & Caldwell

 

Water & Sewer Pipeline Construction

Hendersonville, NC 2014
Hendersonville, NC 2014
Hendersonville, NC 2014
Hendersonville, NC 2014

Wolfpen & Jackson Park Sewer Interceptors

Owner: City of Hendersonville, NC

Engineer: City of Hendersonville Engineering Department

Shakerag Gravity Sewer

Owner: Forsyth County

Engineer: Gaskins Engineering

Stonecrest 2015
Stonecrest 2015
Stonecrest 2015
Shakerag 2015
Shakerag 2015

Stonecrest Sanitary Sewer Improvements

Owner: Dekalb County

Engineer: Jacobs Engineering Group

48" PCCP Water Main Replacement

- Athens Hwy to Loganville Hwy

Owner: Gwinnett County

Engineer: ESI

Dothan Alabama Rock Creek Trunk Line

Owner: City of Dothan

Engineer: PolyEngineering

Loganville 2016
Dothan 2016

~                                                                                                                                 

 

John D Stephens, Inc.